<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=1167869489960432&amp;ev=PageView&amp;noscript=1">

Build Update: January 18, 2016

Posted by Habitat Admin on Jan 18, 2016 3:27:52 PM

january-18-build-update.jpg

Pineridge, Calgary

Build Update - Jan. 18, 2016

  • Volunteers are needed to frame the interior/exterior of the second fourplex.
  • Other volunteer jobs include insulating and polying the basements and building guard rails for the porches.

There's still time to become a Winter Warrior! Sign up for a shift today.

Topics: Build Update, News Story, Pineridge